Menu



Steel constructions

2015 – 2016, On site delivery: Belchentunnel Portal South, Hägendorf, Switzerland

The execution of
• the Pflege number 2 trolleys with the purpose of placing the conveyor bridges in the tunnel.
• IPE conveyor belt bridges;
• conveyor belt support elements, “Lightweight B100”
Different types & dimensions of structures have been delivered in significant quantities.
Anticorrosive protection: Sandblasted SA2 ½, 3x 2-component epoxy paint, 120μ