Menu



Steel constructions

On site delivery:  Belchentunnel Portal South, Hägendorf, Switzerland

The execution of the Pflege number 2 trolleys with the purpose of placing the conveyor bridges in the tunnel.

Anticorrosive protection: Sandblasted SA2 ½, 3x 2-component epoxy paint, 120µ.