Menu



Steel constructions

Delivery to site: Follo Line Tunnels Oslo, Norway

The execution of the component parts necessary for the support posts of the conveyor belt bridges.

A large quantity of different versions and in different lengths / heights has been delivered.

Anticorrosion protection: Sand blasting SA2 ½, 120 microns; Epoxy system, two component paint.